Layer back

Customized turbine design

The focus at AEROVIDE is on overall developments, where we support our customers during all phases of the project, from the initial concept studies right up to certification of the new wind turbines. We have experience in all drive train technologies like conventional concepts, integrated drives, direct drives or hybrid drives. AEROVIDE can provide tailored complete wind turbine designs from the tip of the blade to the tower foundation or we can work as a partner together with the client in a joint development project with partial design.

Wind Turbine Drive Train Examples:

Direct Drive

Gearless drive train

Conventional Drive

Separate drive train
with gearbox and high-speed generator

Hybrid Drive

Combined drive train by unit of gearbox
with medium-speed generator

Partial integrated Drive

Drive train with integrated gearbox and
high-speed generator

Integrated Drive

Integrated compact drive train
with medium-speed generator


You have an idea? AEROVIDE implements these and develops the individual wind turbine according to your wishes, no matter if complete design or only single part of the system. We are your partner for all different types of concepts such as for example: HAWT, VAWT, small wind. upwind or downwind, onshore or offshore, floating, multi-rotor, 2 bladed, 3 bladed or multi-rotor, water desalination plant, alternative materials, etc. AEROVIDE have references for almost all variants from the last 4 decades.


Our revolutionary developments result from the close and proven interaction of all work areas and departments, the software tools which are constantly developed further, the commitment of our qualified staff and many years of experience in the branch. Different turbine concepts ranging between 5 kW and 10 MW have been implemented in the last 30 years.

Support and supervision of the assembly process as well as installation and commissioning of the prototype of your new turbine model round off AEROVIDE range of services. This way we ensure that you have consistent project management and continuous support down-the-line from the initial concept drafts up to the certified wind turbine.

The development process at AEROVIDE is broken down into the following five steps:

1. Concept & design basis
2. Basic design
3. Detailed design
4. Prototype support
5. Certification

The technical documentation that results from the development activity includes the following documents:

  • Design reports, drawings and specifications for structural components
  • Purchase component specifications
  • Assembly drawings & parts lists
  • Single part drawings
  • Manuals for assembly, installation and commissioning
  • Electrical wiring diagram and control system software