Milestones
2023
Design and detail calculation of segmented tubular steel towers for multi-megawatt turbines
2023
aeroMaster 1 MW design with conventional drive train design including blades started, prototype expected in 2025
2023
40 years anniversary of AEROVIDE
2022
Upgrade of direct drive turbine with bigger rotor, higher rated power and new advanced control system
2022
Concept Design for a 15 MW offshore wind turbine with an innovative semi-integrated drive train for a Chinese customer
2021
aeroMaster 4 modified and adopted for a Chinese customer
2021
Lattice towers for market with limited transport capability
2021
Stall-to-pitch project with redesign of the turbine to increase AEP with focus on cost
2021
Gold medal winner rotor blade by Windpower Monthly for AEblade 14.0-111.0
2020
Concept Design for an 8 MW onshore wind turbine with an innovative semi-integrated drive train for a Chinese customer
2020
Rebranding to AEROVIDE GmbH
Joint development of an 8MW offshore direct drive wind turbine
IPC (individual pitch control) retrofit solution available
2019
AEblade 3.x - 71.0 for Ø145m rotor added to the AEblade family portfolio
Joint development of a 10MW direct drive turbine
2018
Joint development and individual design on 3MW onshore wind turbines
Joint Development Project successfully completed. Korean customer UNISON has installed new U136-4.2MW Wind turbine based on AEROVIDE concept.
2017
New AEROVIDE rotor blade family from 4.xMW to 5.xMW class available.
Based onto the aeroMaster 2.0MW 120m wind turbine, the prototype finished workshop installation in Asia.
Design of wind turbine controller aeroControl with alternative hardware supplier
Upgrade and Retro-Fit of 750kW wind turbine
2016
Introducing of modern multibody simulation code HAWC2 for advanced turbine load simulations
2015
AEblade-2.0-58.3 added to the AEROVIDE blade family portfolio
Customer-specific A-Design Assessment for Zhejiang Huayi Wind (HEAG) for the HW3/ S2500 (103) in China
2014
aeroMaster 3.0 rank on place 3 of top 5 wind energy innovations of year 2014 (Windpower Monthly)
aeroMaster 5.0/139, TC2B receives B-Design-Certificate from DEWI-OCC
Hyosung installs aeroMaster 5.0/139 prototype on Jeju Island - South Korea
2013
A-Design Assessment for aeroMaster 2.5 MW (Certificate issued by TÜV-Nord)
Signing of further license agreement for aeroMaster 1.5
Engineering service for 8MW offshore wind turbine
Change in management, Rainer Osthorst und Markus Rees appointed as Managing Director
2012
Extension of AEROVIDE blade family (AEblade) with huge blade length for low wind locations
A-Design Assessment for aeroMaster 1.5 MW (Certificate issued by TÜV-Nord))
2011
Signing of further license agreements for aeroMaster 1.5 and aeroMaster 5.0
aeroMaster 1.5 received Design Assessment
Prototype of aeroMaster 2.5 installed
2010
Signing of license agreements for aeroMaster 5.0
Start of the development AEblade 3.0
Start of the development aeroMaster 5.0
Prototype of aeroMaster 1.5 installed
Signing of further license agreements for aeroMaster 2.5
2009
Signing of the first license agreement for aeroMaster 2.5
Signing of further license agreements for aeroMaster 1.5
Development contract for a 3.0 MW wind turbine in Korea
Founding of Aerodyn® Energiesysteme Consulting (Shanghai) Co., Ltd.
Signing of further license agreements for AEblade
2008
Signing of the first license agreement for aeroMaster 1.5
Development contract for a 3.6 MW offshore wind turbine in China
Start of the development for license wind turbines aeroMaster 1.5/2.0/2.5 MW
Prototype of AEblade ae 1.5-40.3 completed
Signing of further license agreements for AEblade
Member of the Representative Office of WTSH in Gurgaon, India
2007
Development contract for a 1.5 MW wind turbine in China
Signing of three license agreements for AEblade
Start of the development for license blade AEblade 1.5/2.0/2.5 MW
2006
Development contract for a 1.5 MW wind turbine in China
Development contract for a 1.5 MW wind turbine in China
Development contract for a 2.0 MW wind turbine in China
Development contract for a 1.5 MW wind turbine in China
Opening of its own Representative Office in Shanghai
2005
Rotor blade development in China, 1.5 MW, 40.2 m long
Development contract for a second 5 MW offshore wind turbine, rotor diameter 122 m
First development contract in China for a 2 MW wind turbine
2004
Member of the Representative Office of WTSH in Hangzhou, China
First participation in Wind Power Asia in Peking
First rotor blade development in China, 1.5 MW, 37.5 m long
Installation of the prototype of the first 5 MW offshore wind turbine
Development contract for a 2 MW wind turbine in Korea
2003
Development contract for a 300 KW wind turbine in Japan, rotor diameter 33 m
2002
First development project for Korea, 750 KW wind turbine, direct drive, rotor diameter 50 m
2001
Development contract for a 5 MW offshore wind turbine, rotor diameter 116 m
1999
IF Design Award Multibrid® M5000
1998
Feasibility study for a 5 MW offshore wind turbine, rotor diameter 116 m
1997
Development contract for a 1.5 MW wind turbine, rotor diameter 70 and 77 m
Development contract for a 750 kW wind turbine, direct drive, rotor diameter 48 m
1996
Development contract for a 600 kW wind turbine, rotor diameter 48 m
1994
Development contract for a 1200 kW two-bladed wind turbine, rotor diameter 60 m
1993
Development contract for a 100 kW two-bladed wind turbine, rotor diameter 23 m
Move to new office premises in Rendsburg
1992
Development contract for a 600 kW wind turbine, rotor diameter 43 m
1989
Development contract for a 750 kW wind turbine, rotor diameter 54 m
Participation in the first Husum Wind trade fair
1988
Development contract for a 100 kW two-bladed wind turbine, rotor diameter 20 m
1987
Development contract for a rotor blade for a 250 kW wind turbine.
1986
Aerodyn® changed to Aerodyn® Energiesysteme GmbH
1984
Development and testing of aeolus 11 (30 kW) on the Pellworm test field in Germany.
1983
Aerodyn® founded