Layer back

Milestones

2021

Gold medal winner rotor blade by Windpower Monthly for AEblade 14.0-111.0 

2020

Rebranding to AEROVIDE GmbH
Joint development of an 8MW offshore direct drive wind turbine
IPC (individual pitch control) retrofit solution available

2019

AEblade 3.x - 71.0 for Ø145m rotor added to the AEblade family portfolio
Joint development of a 10MW direct drive turbine

2018

Joint development and individual design on 3MW onshore wind turbines
Joint Development Project successfully completed. Korean customer UNISON has installed new U136-4.2MW Wind turbine based on AEROVIDE concept.

2017

New AEROVIDE rotor blade family from 4.xMW to 5.xMW class available.
Based onto the aeroMaster 2.0MW 120m wind turbine, the prototype finished workshop installation in Asia.
Design of wind turbine controller aeroControl with alternative hardware supplier
Upgrade and Retro-Fit of 750kW wind turbine

2016

Introducing of modern multibody simulation code HAWC2 for advanced turbine load simulations

2015

AEblade-2.0-58.3 added to the AEROVIDE blade family portfolio
Customer-specific A-Design Assessment for Zhejiang Huayi Wind (HEAG) for the HW3/ S2500 (103) in China

2014

aeroMaster 3.0 rank on place 3 of top 5 wind energy innovations of year 2014 (Windpower Monthly)
aeroMaster 5.0/139, TC2B receives B-Design-Certificate from DEWI-OCC
Hyosung installs aeroMaster 5.0/139 prototype on Jeju Island - South Korea

2013

A-Design Assessment for aeroMaster 2.5 MW (Certificate issued by TÜV-Nord)
Signing of further license agreement for aeroMaster 1.5
Engineering service for 8MW offshore wind turbine
Change in management, Rainer Osthorst und Markus Rees appointed as Managing Director

2012

Extension of AEROVIDE blade family (AEblade) with huge blade length for low wind locations
A-Design Assessment for aeroMaster 1.5 MW (Certificate issued by TÜV-Nord))

2011

Signing of further license agreements for aeroMaster 1.5 and aeroMaster 5.0
aeroMaster 1.5 received Design Assessment
Prototype of aeroMaster 2.5 installed

2010

Signing of license agreements for aeroMaster 5.0
Start of the development AEblade 3.0
Start of the development aeroMaster 5.0
Prototype of aeroMaster 1.5 installed
Signing of further license agreements for aeroMaster 2.5

2009

Signing of the first license agreement for aeroMaster 2.5
Signing of further license agreements for aeroMaster 1.5
Development contract for a 3.0 MW wind turbine in Korea
Founding of Aerodyn® Energiesysteme Consulting (Shanghai) Co., Ltd.
Signing of further license agreements for AEblade

2008

Signing of the first license agreement for aeroMaster 1.5
Development contract for a 3.6 MW offshore wind turbine in China
Start of the development for license wind turbines aeroMaster 1.5/2.0/2.5 MW
Prototype of AEblade ae 1.5-40.3 completed
Signing of further license agreements for AEblade
Member of the Representative Office of WTSH in Gurgaon, India

2007

Development contract for a 1.5 MW wind turbine in China
Signing of three license agreements for AEblade
Start of the development for license blade AEblade 1.5/2.0/2.5 MW

2006

Development contract for a 1.5 MW wind turbine in China
Development contract for a 1.5 MW wind turbine in China
Development contract for a 2.0 MW wind turbine in China
Development contract for a 1.5 MW wind turbine in China
Opening of its own Representative Office in Shanghai

2005

Rotor blade development in China, 1.5 MW, 40.2 m long
Development contract for a second 5 MW offshore wind turbine, rotor diameter 122 m
First development contract in China for a 2 MW wind turbine

2004

Member of the Representative Office of WTSH in Hangzhou, China
First participation in Wind Power Asia in Peking
First rotor blade development in China, 1.5 MW, 37.5 m long
Installation of the prototype of the first 5 MW offshore wind turbine
Development contract for a 2 MW wind turbine in Korea

2003

Development contract for a 300 KW wind turbine in Japan, rotor diameter 33 m

2002

First development project for Korea, 750 KW wind turbine, direct drive, rotor diameter 50 m

2001

Development contract for a 5 MW offshore wind turbine, rotor diameter 116 m

1999

IF Design Award Multibrid® M5000    

1998

Feasibility study for a 5 MW offshore wind turbine, rotor diameter 116 m

1997

Development contract for a 1.5 MW wind turbine, rotor diameter 70 and 77 m
Development contract for a 750 kW wind turbine, direct drive, rotor diameter 48 m

1996

Development contract for a 600 kW wind turbine, rotor diameter 48 m

1994

Development contract for a 1200 kW two-bladed wind turbine, rotor diameter 60 m

1993

Development contract for a 100 kW two-bladed wind turbine, rotor diameter 23 m
Move to new office premises in Rendsburg

1992

Development contract for a 600 kW wind turbine, rotor diameter 43 m

1989

Development contract for a 750 kW wind turbine, rotor diameter 54 m
Participation in the first Husum Wind trade fair

1988

Development contract for a 100 kW two-bladed wind turbine, rotor diameter 20 m

1987

Development contract for a rotor blade for a 250 kW wind turbine.

1986

Aerodyn® changed to Aerodyn® Energiesysteme GmbH

1984

Development and testing of aeolus 11 (30 kW) on the Pellworm test field in Germany.

1983

Aerodyn® founded